| Saint John River High Level Crossing |
Article Index for Saint John |
Website Links For Saint John |
Information AboutSaint John River High Level Crossing |
| CATEGORIES ABOUT SAINT JOHN RIVER HIGH LEVEL CROSSING | |
| bridges in new brunswick | |
| queens county, new brunswick | |
| saint john river | |
|
Completed in 2001 and opened to the public in October, 2002 , the bridge carries 4 lanes of the realigned Route 2 ( Trans-Canada Highway ). Total length is 1000 M (0.61 mile) with multiple spans resting on concrete piers. The centre span is 120 m (400 ft) with an airdraft clearance of 60 m (200 ft) for navigational traffic. It was built by the Maritime Road Development Corporation as part of a 230 Km (145 mile) toll highway project. |
|
|