| Run Of River |
Article Index for Run Of |
Website Links For Hydroelectricity |
Information AboutRun Of River |
| CATEGORIES ABOUT RUN-OF-THE-RIVER HYDROELECTRICITY | |
| hydroelectricity | |
|
Power stations on rivers with great seasonal fluctuations require a large Reservoir in order to operate during the dry season, resulting in the necessity to impound and flood large tracks of land. In contrast, run of river projects do not require impoundment of water. Instead, some of the water is diverted from a river, and sent into a pipe called a Penstock . The penstock feeds the water downhill to the power station's Turbine s. The natural force of Gravity creates the Energy required to spin the turbines that in turn generate Electricity . The water leaves the generating station and is returned to the river without altering the existing flow or water levels. Most run-of-river power plants will have a dam across the full width of the river in order to utilize all the river's water for electricity generation. Such installations will have a reservoir behind the dam but since flooding is minimal, they can be considered "run-of-river". ADVANTAGES Flooding the upper part of the river is not required as it doesn't need a reservoir. As a result, natural habitats are preserved and its environmental impact is less than reservoirs. DISADVANTAGES The output is highly dependent on natural run-off. Spring run-off will create a lot of energy while winter will create relatively little energy. Though if a wet sites are choosen, such as the Upper Toba project, this disadvantage is negligable. It has little or no capacity for Energy Storage and co-ordinate the output of the electricity generation at its own. MAJOR RUN-OF-RIVER POWER PLANTS
SOURCES
|
|
|