| Galena Nuclear Power Plant |
Article Index for Galena |
Limousines in Galena |
Website Links For Galena |
Information AboutGalena Nuclear Power Plant |
| CATEGORIES ABOUT GALENA NUCLEAR POWER PLANT | |
| nuclear power stations in the united states region 4 | |
| yukon-koyukuk census area, alaska | |
| energy resource facilities in alaska | |
|
Galena is located in a backwoods part of Alaska along the Yukon River . It is not accessible by roads, leaving only air and water access. Currently, Galena’s energy needs are provided by large shipments of fossil fuels. Electricity use is avoided, and accounts for only 4% of their energy usage. Space heating is done by the end user by using kerosene and wood. Because of the climate where Galena is located, the Yukon River is choked with ice 8-9 months of the year, stopping all river barges. This scarcity of fuel serves to make the cost of energy for residents of the region very expensive. Toshiba has seen this as an opportunity to test out their new Toshiba 4S (Super Safe, Small and Simple) “nuclear battery” reactor design. It requires only minimal staffing. If Galena succeeds in having the reactor licensed, Toshiba will install the reactor free of charge by 2012. The reactor is expected to provide electric energy to residents of Galena and rural surrounding customers for between 5 and 13 cents/kWh, which factors in only operating costs. On paper, it has been determined that the reactor could run for 30 years without being refueled. The technical specifications of the 4S reactor are quite unique in the nuclear industry. The actual reactor would be located in sealed, cylindrical vault 30 meters underground, while the building above ground would be 22 x 16 x 11 meters in size. This power plant is designed to provide 10 megawatts of power, which is more than enough for the rural community of Galena. Many things have to happen for this plan to succeed. As it stands, there are no special deals for smaller and/or less complex nuclear power plants. It typically takes 5 years for a power plant to become licensed, and most companies cannot afford to cover their own costs during this process along with the costs of the licensing agencies. The way that this was done in the past was to use grants just to pay for the licensing fees. Toshiba plans to sell more of these reactors throughout Alaska and the rest of the United States, if the first one succeeds in Galena. REFERENCES |
|
|