Domain Tunnel Article Index for
Domain
Website Links For
Domain
 

Information About

Domain Tunnel




The tunnel was constructed between 1996 and 1999 by Transfield-Obayashi Joint Venture. It is 1.6km long and is comprised of 0.7km of driven tunnel and 900m of cut-and-cover which includes a shallow river crossing.

''See also:'' Burnley Tunnel , an east-bound tunnel running parallel to the Domain Tunnel.


EXTERNAL LINKS