| Portmadoc, Beddgelert And South Snowdon Railway |
Website Links For Beddgelert |
Information AboutPortmadoc, Beddgelert And South Snowdon Railway |
| CATEGORIES ABOUT PORTMADOC, BEDDGELERT AND SOUTH SNOWDON RAILWAY | |
| welsh highland railway | |
| railway lines | |
| uk narrow gauge railways | |
|
The proposal was for a 1'11½" (600 mm) gauge electric railway using Three Phase Alternating Current - a system devised by Ganz of Budapest . Ten electric locomotives were ordered from Bruce Peebles & Co. Ltd. of Edinburgh (who held a licence from Ganz) and at least six were actually built, although none were delivered. All six were scrapped during the first world war. The electrification project was abandoned about 1906 and a steam locomotive "Russell" was ordered from the Hunslet Engine Company of Leeds . All work was abandoned in 1908 , the P.B.S.S.R. never opened to traffic and "Russell" was transferred to the nearby North Wales Narrow Gauge Railway . The P.B.S.S.R. and N.W.N.G.R. were later amalgamated and became the Welsh Highland Railway . Some work undertaken for the P.B.S.S.R. was used for the Welsh Highland. The unused bridge ("Bridge to nowhere") by the Goat Hotel at Beddgelert and nearby bridge abutments in a field are some of the remains of the 1906 construction works. REFERENCES Ffestiniog Railway Heritage Group Wiki SEE ALSO |
|
|