Kalka-shimla Railway Website Links For
Railway
 

Information About

Kalka-shimla Railway




Bhalkoo , the "illiterate genius" had played vital role in the construction of the Kalka-Shimla rail line.The contract for construction was awarded to the Delhi-Umbala Company in 1898 at estimated cost of Rs 86,78,500, however, the cost doubled during execution of the project and it was finally purchased by the state in 1906 for Rs 1,71,07,748. The 96.54 kilometer line, narrow gauge, was opened for traffic November 9, 1903.Because of the high capital and maintenance cost, coupled with peculiar working conditions, the Kalka - Shimla Railway was allowed to charge fares that were higher than the prevailing tariffs on other lines. However, even this was not good enough to sustain the company and the Government had to purchase it on January 1, 1906. Spectacular scenery along the whole route, and the marvels of it's construction, keeps the traveler on this line spell bound. On leaving Kalka, 656 meters above sea level, the railway enters the foothills and immediately commences it's climb. Kalka-Shimla-Railway runs through 102 tunnels, some of which have hoary tales to tell. For instance, the longest tunnel at Barog, named after the engineer in charge of construction, bears the blood of it's creator who apparently committed suicide after making a mistake in laying the alignment. This tunnel is 1143.61 meters long and remained the second longest tunnel on Indian Railways for a long time. It is a straight tunnel, passing through fissured sand stone. The section has 864 bridges, only one of which is a 60 feet plate girder span and a steel truss. The others are viaducts with multi-arched galleries like the ancient Roman aqueducts. Bridge No. 493, historically known as the "Arch Gallery", situated between Kandaghat and Kanoh stations, is an arch bridge in three stages, constructed with stone masonry that stands good even today. Bridge No. 226; between Sonwara and Dharampur is an arch gallery bridge having 5 tier galleries of multiple spans, constructed with stone masonry and bridging a deep valley surrounded by high peaks.The railway has a ruling gradient of 1 in 25 with 919 curves, the sharpest being 48 degrees. Climbing from 656 meters, the line ends at 2076 meters at Shimla.